NOMERA

Surface
Engineering
House
Surface
Engineering
House

MaterialMethodControl

Engineered for Peace of Mind.Engineered for Peace of Mind.

NOMERA delivers engineered surface systems for architectural and construction environments where levels, tolerances, sequence and site conditions decide whether a premium material performs.NOMERA menghadirkan sistem permukaan terekayasa untuk lingkungan arsitektur dan konstruksi, di mana level, toleransi, urutan kerja dan kondisi lapangan menentukan apakah material premium benar-benar bekerja.

230Projects recordedProyek tercatat
1.197.559 m²Surface installedLuas terpasang
11Building sectorsSektor bangunan
Installed surface package, NT Tower

02  /  The RecordRekam Jejak

Evidence before claims.Bukti sebelum klaim.

Everything below is taken from the company project register — installed area, package count and building sector, recorded project by project.Seluruh angka di bawah diambil dari daftar proyek perusahaan — luas terpasang, jumlah paket dan sektor bangunan, tercatat proyek demi proyek.

Figures reflect packages delivered by the operating companies now consolidated under NOMERA. Rows marked as project experience carry their year of execution; remaining years await archived work orders and handover records.Angka mencerminkan paket pekerjaan yang diselesaikan oleh perusahaan operasional yang kini terkonsolidasi di bawah NOMERA. Baris yang ditandai sebagai project experience mencantumkan tahun pelaksanaan; sisanya menunggu arsip SPK dan berita acara serah terima.

0 Projects recordedProyek tercatat Installed surface packages on the company project register.Paket pekerjaan terpasang pada daftar proyek perusahaan.
0m² Surface installedLuas terpasang Cumulative installed area across the register.Akumulasi luas terpasang pada seluruh daftar proyek.
0 Building sectorsSektor bangunan From shopping mall and hospital to factory and place of worship.Dari pusat perbelanjaan dan rumah sakit hingga pabrik dan rumah ibadah.
0m² Largest sectorSektor terbesar Shopping mall & retail — 67 packages.Shopping mall & retail — 67 paket.
0m² Largest single packagePaket tunggal terbesar Trans Studio Bandung, engaged by PT. Total Bangun Persada.Trans Studio Bandung, ditugaskan oleh PT. Total Bangun Persada.
2005 Earliest recorded yearTahun tercatat paling awal The register runs from 2005 to the present.Daftar proyek berjalan sejak 2005 hingga sekarang.

By building sectorMenurut sektor bangunan

Eleven sectors, one method.Sebelas sektor, satu metode.

A mall, a hospital and a factory place different demands on the same surface. The register spans all three.Mall, rumah sakit dan pabrik menuntut hal berbeda dari permukaan yang sama. Daftar proyek mencakup ketiganya.

SectorSektorPackagesPaketInstalled areaLuas terpasang
Shopping Mall & Retail67462.979,26 m²
Hospital & Healthcare17172.976,70 m²
Factory & Industrial52146.494,25 m²
School & Education19115.030,01 m²
Office & Corporate34105.435,80 m²
Apartment & Residential882.622,00 m²
Entertainment, Leisure & MICE951.759,61 m²
Hotel & Hospitality631.227,14 m²
Government & Infrastructure515.600,00 m²
F&B / Restaurant118.070,00 m²
Place of Worship25.364,00 m²
TotalTotal2301.197.558,77 m²

03  /  ClientsKlien

Who engages NOMERA.Siapa yang menugaskan NOMERA.

Packages are engaged by main contractors, developers and principals on projects where the surface scope sits inside a live construction programme.Paket pekerjaan ditugaskan oleh main contractor, pengembang dan pemberi tugas pada proyek di mana lingkup permukaan berada di dalam program konstruksi yang sedang berjalan.

Main contractorMain contractorProjectsProyekInstalled areaLuas terpasang
  • PT. Cipta Dimensi Baja Nusantara22 projectsproyek205.705,45 m²
  • PT. Trans Retail Indonesia16 projectsproyek102.654,12 m²
  • PT. Total Bangun Persada Tbk.7 projectsproyek78.310,82 m²
  • PT. Alfa Retailindo3 projectsproyek78.000,00 m²
  • PT. Acset Indonusa Tbk.6 projectsproyek65.121,00 m²
  • PT. Adhi Karya Tbk.8 projectsproyek51.452,10 m²
  • PT. Tatamulia Nusantara Indah8 projectsproyek51.000,00 m²
  • PT. Dasatria Utama16 projectsproyek47.863,00 m²
  • PT. Fajar Gemilang Semesta8 projectsproyek39.310,45 m²
  • PT. Metropolitan Retailmart5 projectsproyek37.807,88 m²

Ten engaging parties with the largest installed volume on the register. Client marks are not reproduced here without written consent.Sepuluh pemberi tugas dengan volume terpasang terbesar pada daftar proyek. Logo klien tidak ditampilkan tanpa persetujuan tertulis.


04  /  Engineering thesisTesis rekayasa

Premium surfaces rarely fail because of the material.Permukaan premium jarang gagal karena materialnya.

They fail because the conditions around them were never engineered.Kegagalan terjadi karena kondisi di sekitarnya tidak pernah direkayasa.

THE EIGHT CONDITIONSDELAPAN KONDISI

  • 01

    LevelsLevel

    Finished floor levels are set before the first slab arrives — not discovered after.Level lantai jadi ditetapkan sebelum slab pertama tiba — bukan ditemukan setelahnya.

  • 02

    SubstratesSubstrat

    Screed, render and backing are assessed for strength, flatness and moisture before anything is bonded.Screed, render dan backing dinilai kekuatan, kerataan dan kadar airnya sebelum apa pun dilekatkan.

  • 03

    JointsNat & Sambungan

    Movement, perimeter and control joints are positioned by drawing, not by convenience.Movement joint, perimeter dan control joint ditempatkan berdasarkan gambar, bukan kemudahan di lapangan.

  • 04

    TolerancesToleransi

    Lippage, flatness and alignment are verified against a stated tolerance, not judged by eye.Lippage, kerataan dan kelurusan diverifikasi terhadap toleransi tertulis, bukan dinilai dengan mata.

  • 05

    SequenceUrutan kerja

    Surface work is placed in the build programme where following trades will not undo it.Pekerjaan permukaan ditempatkan dalam program kerja di posisi yang tidak dirusak pekerjaan setelahnya.

  • 06

    InterfacesPertemuan

    Where the surface meets glass, metal, joinery or waterproofing is designed — not improvised on site.Titik temu permukaan dengan kaca, metal, joinery atau waterproofing dirancang — bukan diimprovisasi di lapangan.

  • 07

    Site conditionsKondisi lapangan

    Temperature, moisture, protection and access are managed as part of the method.Suhu, kelembapan, proteksi dan akses dikelola sebagai bagian dari metode kerja.

  • 08

    CoordinationKoordinasi

    Setting-out and pattern approval are agreed with the consultant before fabrication begins.Setting-out dan persetujuan pola disepakati bersama konsultan sebelum fabrikasi dimulai.

05  /  What we doApa yang kami kerjakan

Surface systems, engineered as a whole.Sistem permukaan, direkayasa sebagai satu kesatuan.

Seven categories. Each one is a system of substrate, fixing, joint and interface — not a material laid on whatever is underneath.Tujuh kategori. Masing-masing adalah sistem substrat, fixing, sambungan dan titik temu — bukan sekadar material yang dipasang di atas apa pun yang ada di bawahnya.

08  /  How we workCara kami bekerja

NOMERA does not simply send installers to site.NOMERA tidak sekadar mengirim tukang ke lapangan.

Six stages. Each one produces something the next stage depends on — a drawing, an approval, a record.Enam tahap. Setiap tahap menghasilkan sesuatu yang dibutuhkan tahap berikutnya — gambar, persetujuan, catatan.

01

AssessAsesmen

Site, substrate and drawing set are reviewed before any material is ordered.Lokasi, substrat dan set gambar ditinjau sebelum material dipesan.

  • Site & substrate assessment
  • Level & tolerance verification
02

PlanPerencanaan

Setting-out and pattern are drawn, submitted and approved before fabrication.Setting-out dan pola digambar, diajukan dan disetujui sebelum fabrikasi.

  • Setting-out
  • Pattern approval
03

CoordinateKoordinasi

Fabrication, delivery and trade sequence are aligned to the build programme.Fabrikasi, pengiriman dan urutan pekerjaan diselaraskan dengan program kerja.

  • Fabrication coordination
  • Large-format handling
04

ExecutePelaksanaan

Installation runs under named site supervision against the approved method.Pemasangan berjalan di bawah pengawasan lapangan bernama sesuai metode yang disetujui.

  • Named site supervision
05

ControlKontrol

Work is inspected, snagged, logged and reported while it can still be corrected.Pekerjaan diinspeksi, di-snag, dicatat dan dilaporkan selagi masih dapat diperbaiki.

  • Inspection & snagging
  • Defect logging
  • Progress reporting
06

HandoverSerah terima

The package is handed over with documentation, not just a finished surface.Paket diserahkan bersama dokumentasi, bukan hanya permukaan yang selesai.

  • Handover documentation

09  /  ControlKontrol

Control is what makes the difference.Kontrol adalah yang membuat perbedaan.

Eight domains, each with a stated position. Together they are why the outcome of a NOMERA package is predictable rather than hoped for.Delapan domain, masing-masing dengan posisi yang tegas. Bersama-sama itulah sebabnya hasil paket pekerjaan NOMERA dapat diprediksi, bukan diharapkan.

  • 01

    MaterialMaterial

    Specified, verified on delivery, and handled to suit its format and weight.Ditentukan, diverifikasi saat pengiriman, dan ditangani sesuai format dan beratnya.

  • 02

    MethodMetode

    A written method for each condition, approved before work begins.Metode tertulis untuk setiap kondisi, disetujui sebelum pekerjaan dimulai.

  • 03

    Site conditionKondisi lapangan

    Substrate, moisture, protection and access assessed and managed, not assumed.Substrat, kelembapan, proteksi dan akses dinilai dan dikelola, bukan diasumsikan.

  • 04

    ToleranceToleransi

    Stated limits for flatness, lippage and alignment — measured, not estimated.Batas tertulis untuk kerataan, lippage dan kelurusan — diukur, bukan diperkirakan.

  • 05

    CoordinationKoordinasi

    Interfaces with other trades agreed in the programme, before they collide.Titik temu dengan pekerjaan lain disepakati dalam program, sebelum berbenturan.

  • 06

    DocumentationDokumentasi

    Setting-out, approvals, inspections and defects recorded as the work proceeds.Setting-out, persetujuan, inspeksi dan defect dicatat seiring pekerjaan berjalan.

  • 07

    CommunicationKomunikasi

    One accountable point of contact for the package, throughout.Satu titik kontak yang bertanggung jawab atas paket pekerjaan, sepanjang proyek.

  • 08

    AccountabilityAkuntabilitas

    A named escalation path, so a question always has an owner.Jalur eskalasi bernama, sehingga setiap pertanyaan selalu memiliki penanggung jawab.


10  /  Organisation & accountabilityOrganisasi & akuntabilitas

A managed company, not a contracting crew.Perusahaan yang dikelola, bukan kru kontraktor.

Every package has a named escalation path. A question raised on site has somewhere to go, and someone it stops with.Setiap paket pekerjaan memiliki jalur eskalasi bernama. Pertanyaan yang muncul di lapangan punya tujuan, dan punya penanggung jawab akhir.

One project. One accountable team. One point of communication.Satu proyek. Satu tim yang bertanggung jawab. Satu titik komunikasi.

  • Level 01Site RepresentativePerwakilan Lapangan

    Present on site. Records progress, conditions and issues as they happen.Berada di lapangan. Mencatat progres, kondisi dan isu saat terjadi.

  • Level 02Project RepresentativePerwakilan Proyek

    Holds the method and the approved setting-out for the package.Memegang metode dan setting-out yang disetujui untuk paket pekerjaan.

  • Level 03Project CoordinatorKoordinator Proyek

    Coordinates fabrication, delivery and trade sequence against the programme.Mengoordinasikan fabrikasi, pengiriman dan urutan pekerjaan terhadap program kerja.

  • Level 04Head of ProjectKepala Proyek

    Accountable for the package. The escalation stops here.Bertanggung jawab atas paket pekerjaan. Eskalasi berhenti di sini.

11  /  Why NOMERAMengapa NOMERA

Five reasons, all of them structural.Lima alasan, semuanya bersifat struktural.

  • 01

    A specialist, not a generalistSpesialis, bukan generalis

    Surface systems are the whole business — not one package among many.Sistem permukaan adalah keseluruhan bisnis — bukan satu paket di antara banyak paket.

  • 02

    Engineering before installationRekayasa sebelum pemasangan

    The conditions around the material are resolved before the material is laid.Kondisi di sekitar material diselesaikan sebelum material dipasang.

  • 03

    A project team, not a crewTim proyek, bukan kru

    Named roles with defined responsibility, supported from head office.Peran bernama dengan tanggung jawab terdefinisi, didukung dari kantor pusat.

  • 04

    Controlled deliveryPelaksanaan terkendali

    Inspection, snagging and reporting run through the package, not after it.Inspeksi, snagging dan pelaporan berjalan sepanjang paket, bukan setelahnya.

  • 05

    Clear accountabilityAkuntabilitas yang jelas

    One point of communication and a named escalation path.Satu titik komunikasi dan jalur eskalasi bernama.

12  /  CompanyPerusahaan

Directed by design, delivered by discipline.Diarahkan oleh desain, dijalankan dengan disiplin.

NOMERA is directed by a management team accountable for engineering standards, project delivery and client relationships across every package the company undertakes.NOMERA diarahkan oleh tim manajemen yang bertanggung jawab atas standar rekayasa, pelaksanaan proyek dan hubungan klien pada setiap paket pekerjaan yang dijalankan perusahaan.

Next stepLangkah berikutnya

Let’s engineer the surface.Mari rekayasa permukaannya.

For developers, main contractors, architects, interior contractors, hospitality groups and corporate clients. Send the drawings and the programme — we will tell you what the surface scope actually requires.Untuk pengembang, main contractor, arsitek, kontraktor interior, grup hospitality dan klien korporat. Kirimkan gambar dan programnya — kami akan sampaikan apa yang sebenarnya dibutuhkan lingkup permukaannya.